Pre-Installation Planning

Successful solar pump installation begins with thorough site assessment. Measure well depth, static water level, and drawdown. Determine total dynamic head including vertical lift, pipeline friction, and delivery pressure. Assess solar resource using local insolation data.

System sizing calculations match pump capacity to water demand and solar availability. Oversizing arrays by 20-30% ensures adequate production during low-solar months. Pump selection balances flow rate and head requirements.

Installation Steps

Solar panel installation requires secure mounting on poles, roofs, or ground frames. Tilt angle should match latitude for year-round performance. Panels connect in series strings to achieve pump voltage. Proper grounding and surge protection are essential.

Pump installation for submersible models requires proper well casing alignment and cable sealing. Surface pumps need stable mounting and proper suction line installation. Controller installation follows manufacturer wiring diagrams. Pressure tanks and storage integrate with distribution piping.

Commissioning and Testing

Initial testing verifies all connections and settings. Controller programming matches pump specifications. Flow and pressure measurements confirm performance. Documentation of test results supports warranty claims.

Rutan Pump provides installation guides and technical support for our solar pump systems. Contact our support team for installation assistance.

Contact Us

Add: Unit 101, Building 1, No. 520 Shaan, Dongan Village, Daxi Town, Wenling City, Zhejiang Province, China. Wechat/Whatsapp: +86 18267835331 Tel: +86 (0576) 86322398 Email: sales@rutanpump.com Web: www.rutanpump.com Wenling Jingzhan Mechanical & Electrical Co., Ltd.

 
 
 

最新文章

查看全部

留言


bottom of page